Shenzhen Grande Electronic Linkedin Page
                Shenzhen Grande Electronic Co., Ltd logo
                E-mail us for a Quote:
                sales88@greattong.com
                Call us now:
                +86-755-83261869

                Home > Products


                Network Computing Controller Board Assembly PCBA Electronics Manufacturing

                Time:2020-09-23 14:45:15 Click:

                 

                 

                Supplier: Grande Electronics
                Layers: 10

                Application: Network Computing Controller Board Assembly PCBA Electronics Manufacturing

                PCB: Hg 180 / 1.6mm, 3oz finished copper
                Surface Treatment: ENIG

                PCBA Lead time: 3-4 weeks
                Packing: Anti-static bag and compartmental packing
                Standard Warp: <0.75%


                [Description]
                1, Turnkey solution for Network Computing Controller Board Assembly PCBA Electronics Manufacturing

                2, PCB Assembly, PCB fabrication / PCB layout, PCB re-layout.
                3, Electronic Contract Manufacturing.
                4, SMT&DIP&PTH&BGA.
                5, Components Sourcing.
                6, Quick PCBA prototype.
                7, X-ray test, the Internal Circuit Test (ICT) , Functional Test (FCT)
                8, Sample and small batch order are accepted.

                PCBA Service
                Customer offers: Gerber file, PCB Specification, BOM and Assembly Drawing.
                Full-turnkey PCBA: 1-30Layers PCB, Components Sourcing, SMT, PCBA testing, PCBA Aging test, PCBA Packing and PCBA Shipping.

                PCBA Quality Assurance
                1, Certifications: UL, SGS, TUV, BV, ROHS, ISO9001: 2008, TS16949: 2008 
                2, 7 lines dust-proof SMT lines and DIP lines.
                3, All line works wear anti-static and dust-proof clothing.
                4, All operators should pass strictly training before they start work.
                5, SMT Equipment:solder paste printer in Jidakang,, Mounter in Panasonic, Re-flow, Wave Soldering, Semi-auto DIP
                6, PCBA Test Equipment: ORT, Constant temperature and humidity chamber,3D CMM,X-Ray.
                7, PCBA Test:ICT, Functional Circuit Test and X-ray test.
                8, Package Processed:
                0402, 0603, 0805, 1206, 1608, 2125, 3216
                Micro QFP 0.2mm
                Flip-chip, BGA, Connectors
                BGA Ball Pitch=0.2mm
                9, Each workstation in accordance with the SOP 
                10, Materials:FR-4, FPC, Aluminum,High TG,Halogen-Free, HF, CEM-1, CEM-3, FR-1, 94-V0 and so on.
                11, Material Brand:KB, SHENGYI, NANYA and so on. 

                PCBA Lead Time
                PCBA prototype: 7-10 working days after contract signed and EQ confirmed. 
                Mass production: partial delivery according to the customer’s requirement.

                Other information for PCBA
                1, The mass production will be arranged after PCBA prototype confirmed. 
                2, Use Teflon adhesive tape to protect Mount Holes and GND Holes.
                3, EPE is used to avoid impact and crash.
                PCBA Standard Packing
                Anti-static bag and compartmental packing

                 

                Previous:Wet Tower Dispenser 6 Layer Circuit Board | Turnkey PCB & PCBA Service

                Next:Oxygen Concentrator Generator Customized PCBA | One- Stop PCB Assembly

                 
                Home About Us Services Quality Pb-Free News Contact Us


                Copyright ® 2017,Shenzhen Grande Electronic Co., Ltd. All Rights Reserved. English 中文站 Sitemap

                久久久精品2019免费观看