Shenzhen Grande Electronic Linkedin Page
                Shenzhen Grande Electronic Co., Ltd logo
                E-mail us for a Quote:
                sales88@greattong.com
                Call us now:
                +86-755-83261869

                Home > Products


                Electronic Fuel Pressure Regulators Circuit Board Assembly (PCBA)

                Time:2020-08-25 13:46:18 Click:

                 

                Supplier: Shenzhen Grande Electronics
                Layers: 4

                Application: Electronic Fuel Pressure Regulators Circuit Board Assembly (PCBA)

                PCB:FR-4/1.6mm,1oz finished copper
                Surface Treatment: HASL

                PCBA Lead time: 3-4 weeks
                Packing: Anti-static bag and compartmental packing
                Standard Warp: <0.75%


                [Description]
                1, Turnkey solution for Missile Defense Detection System | PCB Assembly for Military | Grande Electronics

                2, PCB Assembly, PCB fabrication / PCB layout, PCB re-layout.
                3, Electronic Contract Manufacturing.
                4, SMT&DIP&PTH&BGA.
                5, Components Sourcing.
                6, Quick PCBA prototype.
                7, X-ray test, the Internal Circuit Test (ICT) , Functional Test (FCT)
                8, Sample and small batch order are accepted.

                PCBA Service
                Customer offers: Gerber file, PCB Specification, BOM and Assembly Drawing.
                Full-turnkey PCBA: 1-30Layers PCB, Components Sourcing, SMT, PCBA testing, PCBA Aging test, PCBA Packing and PCBA Shipping.

                PCBA Quality Assurance
                1, Certifications: UL, SGS, TUV, BV, ROHS, ISO9001: 2008, TS16949: 2008 
                2, 7 lines dust-proof SMT lines and DIP lines.
                3, All line works wear anti-static and dust-proof clothing.
                4, All operators should pass strictly training before they start work.
                5, SMT Equipment:solder paste printer in Jidakang,, Mounter in Panasonic, Re-flow, Wave Soldering, Semi-auto DIP
                6, PCBA Test Equipment: ORT, Constant temperature and humidity chamber,3D CMM,X-Ray.
                7, PCBA Test:ICT, Functional Circuit Test and X-ray test.
                8, Package Processed:
                0402, 0603, 0805, 1206, 1608, 2125, 3216
                Micro QFP 0.2mm
                Flip-chip, BGA, Connectors
                BGA Ball Pitch=0.2mm
                9, Each workstation in accordance with the SOP 
                10, Materials:FR-4, FPC, Aluminum,High TG,Halogen-Free, HF, CEM-1, CEM-3, FR-1, 94-V0 and so on.
                11, Material Brand:KB, SHENGYI, NANYA and so on. 

                PCBA Lead Time
                PCBA prototype: 7-10 working days after contract signed and EQ confirmed. 
                Mass production: partial delivery according to the customer’s requirement.

                Other information for PCBA
                1, The mass production will be arranged after PCBA prototype confirmed. 
                2, Use Teflon adhesive tape to protect Mount Holes and GND Holes.
                3, EPE is used to avoid impact and crash.
                PCBA Standard Packing
                Anti-static bag and compartmental packing


                 


                Previous:Vehicle Engine Control Units (ECU) PCB Layout and Assembly | Turnkey Electronics

                Next:Portable Digital Blood Pressure Monitor PCB Assembly - 58pcba.com

                 
                Home About Us Services Quality Pb-Free News Contact Us


                Copyright ® 2017,Shenzhen Grande Electronic Co., Ltd. All Rights Reserved. English 中文站 Sitemap

                久久久精品2019免费观看